Whitlock OS

Project Detail

Read-only No QB writes 2026-06-10 00:40
← Command Center Open in CompanyCam

Edits below write to local Whitlock state only — not CompanyCam or QuickBooks.

Project evidence

Rambler (Lafayette)

Inferred stage
Open COR
Manual stage override
— (using inferred CompanyCam stage)
Effective stage
Open COR
Inferred PM
Jamie
PM override
Effective PM
Jamie
Inferred crew
Wendy's Crew
Crew override
Effective crew
Wendy's Crew
Updated
2026-05-21
Photos
61
Documents
3
Comments
6

Labels

PM: JamieBrinkmannAIA RequiredWendy's CrewBDLOPEN COR

Documents

NameTypeUpdated
CO 18 hrs 3.24.26_COR 6006 sentimage/jpeg2026-03-24
CO_16hours_3.23.26_COR 6002 sentimage/jpeg2026-03-24
CO_25hrs_3.23.26 V2_COR 6001 sentimage/jpeg2026-03-24

Recent comments

ByCommentCreated
Samantha SmithHello everyone, coming out of the meeting this morning here is an outlook for next week, starting Tuesday the 26th, we will need enough people up here at rambler to be able to 1) keep units going on 6th floor, 2) start putting finish on townhomes and 3rd floor 3) spray vents for remaining exterior pipes (the last 4 colors) (about 150 or so) 4) start finish on hallway ceilings on floors 3, 4, 5 (vision is about done with touch ups) only trying to get ceilings done before flooring we all know walls will keep getting dinged 5) we will and can start entry door frames along with finish coats on each floor 6) and I know brinkman will start throwing different mech rooms and amenity areas at us as they are ready as we did one this week Starting next week we really will need consistent manpower up here as they are pushing all areas not just apartment units, thanks everyone I hope everyone has a good holiday weekend2026-05-22
Samantha Smithwindow for paint lift that Wendy needs to work with 7am lunch 4:30/5pm2026-05-19
Jamie HedgesWe are complete on 5th floor with spraying units out with primer and 1st coat, we are done with section A with trim and doors, can't go any farther as trim guys haven't been here this week2026-05-01
Samantha SmithWe are on the 5th floor, we have primed and 1st coated 1/3 of the rooms on this floor so far, base and doors are being installed in those rooms now, we will have another 10 rooms ready to prime and 1st coat Monday plus the 10 rooms that will need caulked and putty and sprayed with semigloss, plus we have had a lot of extras this week.2026-04-23
Samantha Smithbill $80/hr for carpenters2026-04-15
Samantha Smith$60/hr for Acoustical Ceilings2026-04-15

Recent photo activity

CreatorDescriptionCaptured
Jamie Hedges{"html_content": "<p>Putting the trim up in hallways</p>", "id": "42427556", "plain_text_content": "Putting the trim up in hallways"}2026-05-21
Jamie Hedges2026-05-20
Jamie Hedges2026-05-20
Jamie Hedges{"html_content": "<p>This is hallway we are trying to spray units in,,everyone on whole job is in&nbsp;</p>", "id": "40479107", "plain_text_content": "This is hallway we are trying to spray units in,,everyone on whole job is in "}2026-04-28
Samantha Smith2026-04-14
Jamie Hedges{"html_content": "<p>Units we finished Thursday trim guys are chasing us that quickly,,,everyone catching up time vision lost</p>", "id": "39245017", "plain_text_content": "Units we finished Thursday trim guys are chasing us that quickly,,,everyone catching up time vision lost"}2026-04-10
Jamie Hedges2026-04-10
Jamie Hedges{"html_content": "<p>We are putting fans on every room after prime so we can sand and do finishes after lunch</p>", "id": "39244712", "plain_text_content": "We are putting fans on every room after prime so we can sand and do finishes after lunch"}2026-04-10
Jamie Hedges2026-04-10
Jamie Hedges2026-04-10